One contract. One team. One number to call.

Design-build puts design, permits and construction under one contract, so one team is responsible for the whole result.

01Why it matters

The traditional route, or design-build.

Separate designer and contractorUCG design-build
ContractsOne contract for design, another for constructionOne contract for both
ResponsibilityDesigner and contractor can blame each otherOne team accountable for the whole result
CostThe real price is known only after the tenderCost is tracked from the first sketch
ScheduleDesign must finish before tender and constructionDesign, permits and construction planning overlap
Point of contactSeveral parties to coordinate yourselfOne dedicated project manager
WarrantySplit between several partiesOne written 10-year warranty on workmanship

02Five steps

From first conversation to handover.

  1. Reviewing drawings at a consultation
    01

    Feasibility

    We review the site, the planning rules and your budget, and give you a clear answer on whether the project works. You leave with a budget range and a recommended next step.

  2. Material samples: marble, oak, travertine and brass
    02

    Design

    Concept, layouts, materials and drawings, developed with the build cost in view. When you approve the design, you receive a fixed price for the agreed scope.

  3. A room prepared for works, with lighting and equipment
    03

    Permits

    We prepare and submit the applications, coordinate with the authorities and keep you informed until the decisions are issued.

  4. A craftsman fitting a hinge to an oak door
    04

    Construction

    A dedicated project manager, a written schedule and regular progress reports. Our crews and trusted trades work to one standard.

  5. House keys placed on a stone console table
    05

    Handover

    Final inspection, as-built documentation, keys and a written 10-year warranty on workmanship. We stay your point of contact after handover.

03The UCG promise

One contract. One team. One date you can plan around.

  1. 01

    A cost model before you commit

    Site, zoning and budget reviewed up front, so you know whether the scheme works before you sign for design.

  2. 02

    One accountable point of contact

    A dedicated project manager from the first meeting to handover, not an account manager relaying messages.

  3. 03

    Reporting at every milestone

    Programme, cost and quality reported at each stage, with photos from site.

  4. 04

    A written warranty

    A written warranty on workmanship at handover.